132kwXGJ560 wood pellet machine send to Indonesia on 20th, May
Product description
A. Firstly remove the Pelleting Room Hat and the Kick Out De- vice, then loosen the roller, let them not connected with the ring die. Then clean the materials on the inner side of the ring die.
B. Remove the bolts for the ring die Press Block ,Push all 9 ring die Press Block with lifting Jack. For more tight Press Block can be taped by hammer using vibration to make it out. Lifting the ring die after remove the Press Block, Change a new ring die or re- verse ring die to using up-side layer.For install ring die, According to the above process in turn back to Ring Die and Press Block. Must clean up the place below the Ring Die, tight the Press Block symmetrical and evenly.
SHANDONG LONGZE MECHANICAL EQUIPMENT CO.,LTD